gqchris
Well-Known Member
- Joined
- Mar 24, 2008
- Messages
- 8,892
- Reaction score
- 14,706
Came down the 40 today. Expect road work all over the place. I encounted it at Ludlow all the way past about 30 miles. Thats median work. Then after crossing river, they have one lane slurried all the way to the Havasu turnoff.
Also. I literally passed 10 Chp’s on the way in. All running radar. My detector was working overtime. Keep your eyes open fellas.
Also. I literally passed 10 Chp’s on the way in. All running radar. My detector was working overtime. Keep your eyes open fellas.