So I am trying to finish our remodeling of the down stairs. One of the steps is the 3/4 bath. I don't want to get carried away since it is just a basic "track home", but I did want it to be updated. This is going to be the first time I patched the drywall, textured and installed the tile. I think it is turning out ok. I started taking the pictures after the texture and painting, but hear are a few shots of my progress.
Had a little trouble on the back side of the toilet. Had a choice of two smaller pieces on each side of the toilet or this way. Just felt it would be mostly behind the toilet so i did it this way.
Almost done! Need to attached the sink and add a couple tiles on the side of the sink. Then add the base boards and toilet install.
After this I need to paint the hall, doorjambs and the doors...I hate painting
Had a little trouble on the back side of the toilet. Had a choice of two smaller pieces on each side of the toilet or this way. Just felt it would be mostly behind the toilet so i did it this way.
Almost done! Need to attached the sink and add a couple tiles on the side of the sink. Then add the base boards and toilet install.
After this I need to paint the hall, doorjambs and the doors...I hate painting