ltbaney1
Well-Known Member
- Joined
- Oct 10, 2012
- Messages
- 3,255
- Reaction score
- 6,274
So im redoing my master shower. I got it all gutted and framed back in, had the hot mop done earlier this week, going to do the Hardibacker and drywall tonight / tomorrow morning and start tile on sunday. im good with tiling the walls. question is about the hot mop, they did the 1/4" per inch slope under the hot mop, but do i need to do a mud bed prior to laying thin set and tile? ive gotten both yes and no, so im turning here to the experts. if it matters my plan as of right now is tile the walls first and work my way out the shower and bathroom by doing the floor (shower and bathroom floor will have same tile. thanks for any insight.