setbacks vary per property, standard Havasu residential (1) is 25' front and rear, 5' each side, you can build Living area 5' into the front setback but the garage must remain at the 25' set back, Detached garage not built into the rear setback must have 6' separation eve to eve or 10' separation eve to eve if encroaching the rear set back, you may encroach 15' into the rear set back. As for cost a RV height 15' tall is running $60 - $75 per sqft depending on options and builder.
I draw plans and work with several builders in Havasu, feel free to call me for any other building concerns. my phone number is in your PM box
better find that restoreable truck now and sit on it, with the popularity of trucks these days the prices are going up and they are getting harder to findOne of these days... Ill be contacting you for this... Also want to build/ buy my wife a 55-59 chevy pickup restomod for our 25th anniversary.
<<< Really needs to win the Lotto.
Hey do u still do rv garage drawings ?setbacks vary per property, standard Havasu residential (1) is 25' front and rear, 5' each side, you can build Living area 5' into the front setback but the garage must remain at the 25' set back, Detached garage not built into the rear setback must have 6' separation eve to eve or 10' separation eve to eve if encroaching the rear set back, you may encroach 15' into the rear set back. As for cost a RV height 15' tall is running $60 - $75 per sqft depending on options and builder.
I draw plans and work with several builders in Havasu, feel free to call me for any other building concerns. my phone number is in your PM box
If this is a real person/question it would probably be best to start a new thread rather than dig up a 12 year old one.Hey do u still do rv garage drawings ?
Last I saw he was still in the area. Try a direct PMHey do u still do rv garage drawings ?
Is this Trav by chance?Hey do u still do rv garage drawings ?
Yes it’s a real person and I found the forum so sent a message as I didn’t want to loose thread and not find it !! A friend of mine has already reached out to get me in touch.. sorry but at least it was seen lolIf this is a real person/question it would probably be best to start a new thread rather than dig up a 12 year old one.
I’d love the infoOur son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
Is he an Architect & Engineer, one stop shop? Is this a side gig, or full time deal for him?Our son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
There a lot of bots that join and comment on old posts. It seemed like a real post. You are being takin care of that's all that matters.Yes it’s a real person and I found the forum so sent a message as I didn’t want to loose thread and not find it !! A friend of mine has already reached out to get me in touch.. sorry but at least it was seen lol
Looks awesome Tim. He did a great job. Love how you opened up the kitchen. The windows are badass !!!!!!!Our son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
He’s a friend of mine. I’ll pm you his number if you don’t mind I don’t think he can pm yet.Our son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
I've wondered the same thing. In the last 4-5 years I've watched two popular Havasu builders raise their 3BR RV garage home from $289.900 to $469.900 on your level lot. They've both been there for well over a year and both increased even after I heard that lumber had fallen. IMHO it's going to take a faltering economy for prices to drop.To builders, has to cost gone down a bit in the past two years due to lumber pricing?
Lumber is down but not overall costs.To builders, has to cost gone down a bit in the past two years due to lumber pricing?
PM Sent after you sent the one to me.I’d love the info
PM sent.Is he an Architect & Engineer, one stop shop? Is this a side gig, or full time deal for him?
Thanks it is finally coming together. Hope to be completed in a couple more weeks. Then we just have to do the yards and build a pool. Hoping that happens late this year. I am tired. LOLLooks awesome Tim. He did a great job. Love how you opened up the kitchen. The windows are badass !!!!!!!
That turned out awesome ! What was your cost on the remodel?Our son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
Yeah met on thurday and have the plans being drawn up now!There a lot of bots that join and comment on old posts. It seemed like a real post. You are being takin care of that's all that matters.
Still wayz out on this for us, but knowing this just opened up a whole lot more homes to consider, as long as there is room for an RV garageOur son is able to do the drawings. He did our RV garage for permit as well as our Kitchen renovation. Was going to post up these images and I might as well do it here. Pm me if you are not a bot OR AI and want the contact.
Before….
View attachment 1469768 View attachment 1469770
After….
View attachment 1469769 View attachment 1469771 View attachment 1469772
If you have a guy then I’d suggest that you discuss pricing with those people. Getting numbers from others might muddy up the numbers for you. As it might be talking apples to oranges. There are many levels of finishes and that can affect pricing.That turned out awesome ! What was your cost on the remodel?
Yeah met on thurday and have the plans being drawn up now!
I’ve never heard that before. Interesting thought. He’s a contractor so I’m sure that will help offset some of the costs. This thread is literally asking about the price of rv garages i dont think asking prices muddys up anything. Just gives ideasIf you have a guy then I’d suggest that you discuss pricing with those people. Getting numbers from others might muddy up the numbers for you. As it might be talking apples to oranges. There are many levels of finishes and that can affect pricing.
OK.I’ve never heard that before. Interesting thought. He’s a contractor so I’m sure that will help offset some of the costs. This thread is literally asking about the price of rv garages i dont think asking prices muddys up anything. Just gives ideas
Just thought it was an interesting post considering what the title of this thread is.
No plumber. I had a restroom installed and roof drains.He subbed out
Framing
Stucco
Roofing
Drywall hang & finish
Paint
Paver driveway
I did the same as a owner GC in 2004.Took me about 6 months from start to finish. Kinda hard to do from So Cal. I took a week off once the framing was done. Meet the building inspector on Monday and told him he would be back on Friday for rough in. He laughed and said this is Havasu. Luckily all the trades showed up and got it done by Friday. The inspector couldn’t believe it. Of courses once I left the work slowed down a little.He did -
Played GC
Slab set up
Pour all concrete
Electrical
Plumbing
Low volt
Gutter drain @ paver driveway
All demo and trash haul off
Side gates
Set doors
Took him about year and a half !
He had the house color coated stuccoed so it would all match
New roof on existing house.